Unifi ed Data Model for Scheduling Based on PSLX[J]. Aeronautical Manufacturing Technology, 2010, 53(2): 66-70. DOI: 10.16080/j.issn1671-833x.2010.02.022.
The development of planning and scheduling model is introduced comprehensively. And the integrated structure of APS specifi catoin
level structure of data model and methodology of model establishment are emphasized.The application prospects and direction of unified data model for scheduling in system integrations are pointed out.