您当前的位置:
首页 >
文章列表页 >
Research on Modified Multi-Agent Model for Job-Shop Scheduling Based on Interval-Synergy-Auction Scheduling Strategy
更新时间:2025-10-30
    • Research on Modified Multi-Agent Model for Job-Shop Scheduling Based on Interval-Synergy-Auction Scheduling Strategy

    • Aeronautical Manufacturing Technology   Vol. 62, Issue 7, Pages: 34-42(2019)
    • DOI:10.16080/j.issn1671-833x.2019.07.034    

      CLC:
    • Published:2019

    移动端阅览

  • GUAN Chencheng, TANG Dunbing, WEI Xin, SHEN Xiaoyu. Research on Modified Multi-Agent Model for Job-Shop Scheduling Based on Interval-Synergy-Auction Scheduling Strategy. Aeronautical Manufacturing Technology, 2019, 62(7): 34-42. DOI: 10.16080/j.issn1671-833x.2019.07.034.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

342

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research Progress on In-Plane Shear Mechanical Behavior of Silicon Carbide Ceramic Matrix Composites
Design and Experimental Verification of Stitching Forming System for Rigid Sandwich Composite Preforms
Modulation of Pore Structure and Properties in Phenolic Aerogels by Cationic Polyelectrolytes
Research Progress on Ceramic Matrix Composites for Aviation Applications
Assessment of Technological Advancement Based on Fuzzy Comprehensive Evaluation

Related Author

No data

Related Institution

No data
0