Aiming at the integration problem of cutting and distributing shelves in traditional manufacturing enterprises
by analyzing the production site constraints such as the number of manufacturing racks and production processes
a heuristic method is proposed to solve the cutting stock problem
and the distributing shelves algorithm is transferred to make the sub-material fail down. The heuristic strategy is used to optimize the cutting sequence of the cutting scheme and the sequential optimization of the single-piece material falling frame
which solves the problem of integration of the material and the rack in the manufacturing workshop. The practicality and effectiveness of the method are verified by examples
which meet the actual production constraints and production requirements
and realize the intelligent production of the enterprise.