您当前的位置:
首页 >
文章列表页 >
Construction of M–BOM for Aircraft Manufacturing Measurement Management
更新时间:2025-10-30
    • Construction of M–BOM for Aircraft Manufacturing Measurement Management

    • Aeronautical Manufacturing Technology   Vol. 63, Issue 23/24, (2020)
    • DOI:10.16080/j.issn1671-833x.2020.23/24.072    

      CLC:
    • Published:2020

    移动端阅览

  • LIANG Qingxiao. Construction of M–BOM for Aircraft Manufacturing Measurement Management[J]. Aeronautical Manufacturing Technology, 2020, 63(23/24). DOI: 10.16080/j.issn1671-833x.2020.23/24.072.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

502

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Inverse Solution Algorithm for Take-Up Speed in Preparation of Braided Reinforced Composites Considering Carbon Fiber Yarn Friction
Analysis and Prospect of Assembly Technology of Aircraft Composite Fuselage Panel
Intelligent Monitoring Platform for Milling Machining Based on Digital Twin
Review on Key Technologies and Typical Applications of Digital Twin in Manufacturing Industry
Event-Driven Product Digital Twin System Construction and Quality Prediction

Related Author

CUI Can
FAN Zhen
ZHANG Senlin
CHEN Wenliang
LI Yixing
FENG Suling
TONG Shouwei
HUANG Shuhai

Related Institution

Jinhua Institute, Zhejiang University
College of Electrical Engineering, Zhejiang University
COMAC Shanghai Aircraft Manufacturing Co., Ltd.
Nanjing University of Aeronautics and Astronautics
State Key Laboratory of Robotics and System, Harbin Institute of Technology
0